N&N PROPERTY VENTURES LTD

Development, letting and sale of its own residential stock.37 Thornbury Road, London SW2 4DL.

Five stages, and one file per unit that follows them

N&N PROPERTY VENTURES LTD buys small residential units in south London, refurbishes them, lets them, holds them, and sells one on when holding it no longer makes sense. The company was incorporated on 18 August 2026 and works from 37 Thornbury Road in London.

The same five stages run on every unit, in the same order, and the office keeps one file per unit that follows them: acquire, refurbish, let, hold, sell. This site is that order written out. Pick a stage and the band for it below marks itself as the one being read; each band links to the page holding the detail.

The plan stays on the board until the snagging list is empty

The drawing below is the one the office works from: a two-bedroom unit with the walls set out on a four-hundred-millimetre grid, door swings marked, window openings picked out, and the overall width dimensioned along the bottom. It is the first thing pinned up when a unit is taken on and the last thing taken down.

LIVING / KITCHEN BED 1 HALL BATH BED 2 STORE 18 × 400 mm GRID
An indicative plan drawn to the office grid. Room sizes on it are grid squares, not a surveyed dimension.

The room names on the plan are the names used everywhere else — on the schedule of works, on the snagging list, and on the inventory handed over at move-in. Keeping one set of names is the cheapest way to stop a trade pricing the wrong room.

The first stage is the only one that can be stopped cheaply. Everything after it is committed, which is why the reading below happens before an offer goes in rather than after one is accepted.

01stage one of fivethe stage being read

Acquire — the unit is read before anything is offered on it

Nothing is offered on until the title register, the lease where there is one, the survey and the access are read together. Access settles more than anyone expects: a unit with nowhere to stand a skip and no side gate adds days to every stage after strip-out. The stage closes with a dated decision note recording what was read, what was found, and the works list it produced.

Read at acquisition
ReadComes fromWhat it settles
Title register and planLand Registryboundaries, rights of way, charges
Lease and service charge accountsfreeholder or managing agentterm left, who repairs what, consent to alter
Level three surveythe surveyor instructedthe works list and the order it runs in

Taking a unit on

What that reading produces is a works list and an order to run it in. The order is the same on every unit, and the reason is in the stage below.

02stage two of fivethe stage being read

Refurbish — six stages, one order, every unit

The works run strip-out, first fix, plaster, second fix, decoration, snagging. The order does not change, because each stage buries the one before it: a socket moved after the skim is a patch, and a patch shows through two coats. Only the durations change with the unit. The programme builder further down this page takes six durations in working days and prints the dates they land on.

What ends a stage
StageEnds whenNext stage waits for
First fixcables and pipes are in and testedthe test certificate, before anything is boarded over
Plasterthe last wall is skimmeddrying time, which is weather and not programme
Snaggingthe list is signed off emptyphotographs, and then the letting pack

Schedule of works

A unit is not finished when the works finish. It is finished when the snagging list is empty, and that same day is the first day of the letting stage.

03stage three of fivethe stage being read

Let — the unit is photographed the day snagging closes

A finished unit is photographed on the day the snagging list closes and not before, because a photograph with a filler patch in it gets shown back to the office at the viewing. Referencing, the inventory, the meter readings and the key count all sit on the move-in date. That is why the move-in date is set last and moved only in writing.

The letting record
StepRecord keptKept until
Referencingcheck record, references as they came backthe tenancy ends, and a year after
Inventoryschedule of condition with photographsthe deposit is settled
Move-inmeter readings, key count, prescribed informationsix years after the tenancy ends

Letting the finished unit

Letting takes a week. Holding is the years after it, and it is the stage in which the file either earns its keep or turns out to be thin.

04stage four of fivethe stage being read

Hold — a fixed inspection cycle and a repair log that closes

A held unit is visited on a fixed cycle and whenever the tenant reports something. The visit works to the same list every time so that two visits can be compared: damp read at the same four points with the same meter, seals by hand, extract pull at the grille, alarms tested in front of the tenant, window ironmongery opened and closed. A repair is closed on the date a follow-up finds it done, not on the date the trade left.

What a visit produces
VisitLooks atWritten up as
Periodic visitdamp points, seals, fans, alarms, ironmongerya dated sheet with photographs, filed next to the last one
Reported repairthe item reported, and whatever sits next to ita log line with the attendance date and the closing date
Compliance visitgas appliance, fixed wiring, alarmsthe certificate itself

Holding and inspections

Most units are held. The last stage happens occasionally, and it is straightforward only because the four in front of it were written down.

05stage five of fivethe stage being read

Sell — the file was already the pack

A unit is sold when holding it stops making sense: a lease term getting short, a decision taken for the whole block that the company holds one vote in, or a works list that will not pay for itself. Because the file was kept stage by stage, what the buyer’s solicitor asks for is already in it. Nothing is reconstructed from memory after the event.

Answered from the file
EnquiryAnswered fromOn the file since
Electrical installationthe certificate issued at second fixthe works
Replacement windowsthe installer’s own registered schemethe works
Service chargeaccounts from the managing agent, filed as receivedacquisition

Selling a unit on

Programme builder — set the start, set the six durations

Enter the day the programme opens and how many working days each stage is given. Every stage starts on the next working day after the stage in front of it finishes, Saturdays and Sundays are stepped over, and the arithmetic for each row is printed beside it.

Working days per stage

With scripting switched off the stages are not dated. The order above is the order the works run in and the figures in the boxes are the durations the office starts from, so the schedule still reads.

Why weekends are stepped over rather than counted

A stage is measured in working days because that is what a trade is on site for. Four calendar weeks are twenty-eight days and twenty working days, and the eight in between are what make a four-week programme land a week and a half late.

M T W T F S S wk 1 wk 2 wk 3 wk 4 20 days counted 8 stepped over

The builder counts working days only. Bank holidays are added by hand to the stage they fall in, because the office shuts on them and the arithmetic above does not know that.

Company and registered office

From the register
ItemEntry
Registered nameN&N PROPERTY VENTURES LTD
Company number17407567
D-U-N-S number235087171
Incorporated18 August 2026
JurisdictionEngland & Wales
Registered office37 Thornbury Road, London SW2 4DL, United Kingdom
SIC 41100Development of building projects
SIC 68209Other letting and operating of own or leased real estate
SIC 68100Buying and selling of own real estate
Correspondenceprojects@nnpropertyventures.online

Post about a unit, a tenancy or a works programme goes to the registered office or to the correspondence address above. There is no form on this site, and nothing on it records a visit; what the office does hold is on the records page.